Category
Power Plant Projects
Project Date
05 August 2026
Project Scope
1000 MW Steam Turbine Erection
Project Information
SEPCO / Siemens – Jazan / Saudi Arabia
JIGCC Power Block Project
Zack Power Systems participated in 1000 MW steam turbine erection works for the JIGCC Power Block Project in Jazan, Saudi Arabia.
- Capacity: 1000 MW
- Scope: Steam Turbine Erection
- Company: SEPCO / Siemens
- Location: Jazan / Saudi Arabia
- Project Date: 06.10.2021