Mechanical Erection and Commissioning in Power Plants

Mechanical Erection and Commissioning in Power Plants
Power Plants 1 min read

Mechanical Erection and Commissioning in Power Plants

Why correct erection is critical in power plants

Gas turbines, steam turbines, generators, condensers, air intake systems and auxiliary equipment operate as interconnected systems. Mechanical erection is therefore not simply a matter of positioning equipment; tolerances, connections and overall system integrity must be managed according to project requirements.

Checks before commissioning

After erection, alignment, connections, piping, equipment condition and relevant test records should be reviewed systematically. A small nonconformity identified during pre-commissioning can prevent a much larger interruption during commissioning.

The value of field experience

Zack Power Systems combines its experience in mechanical erection, pre-commissioning, commissioning and maintenance with disciplined site planning. The objective is a safe, controlled and sustainable commissioning process.