{"id":366,"date":"2026-06-16T12:12:43","date_gmt":"2026-06-16T09:12:43","guid":{"rendered":"https:\/\/zackpowersystems.com\/2026\/06\/29\/9-mw-cogeneration-project-successfully-commissioned\/"},"modified":"2026-06-29T14:47:47","modified_gmt":"2026-06-29T11:47:47","slug":"9-mw-cogeneration-project-successfully-commissioned","status":"publish","type":"post","link":"https:\/\/zackpowersystems.com\/en\/9-mw-cogeneration-project-successfully-commissioned\/","title":{"rendered":"9 MW Cogeneration Project Successfully Commissioned"},"content":{"rendered":"<p>The 9 MW cogeneration facility, for which we managed the engineering, procurement, and commissioning processes from a single source, has been successfully brought into operation. In addition to generating electricity, the facility also meets process heat demand, significantly increasing overall energy efficiency.<\/p>\n<p>Site coordination, installation, and performance testing on the project were carried out by our teams.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 9 MW cogeneration facility we built in an organized industrial zone was commissioned ahead of the planned schedule.<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-366","post","type-post","status-publish","format-standard","hentry","category-uncategorized-tr"],"acf":[],"_links":{"self":[{"href":"https:\/\/zackpowersystems.com\/en\/wp-json\/wp\/v2\/posts\/366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zackpowersystems.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zackpowersystems.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zackpowersystems.com\/en\/wp-json\/wp\/v2\/comments?post=366"}],"version-history":[{"count":1,"href":"https:\/\/zackpowersystems.com\/en\/wp-json\/wp\/v2\/posts\/366\/revisions"}],"predecessor-version":[{"id":550,"href":"https:\/\/zackpowersystems.com\/en\/wp-json\/wp\/v2\/posts\/366\/revisions\/550"}],"wp:attachment":[{"href":"https:\/\/zackpowersystems.com\/en\/wp-json\/wp\/v2\/media?parent=366"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zackpowersystems.com\/en\/wp-json\/wp\/v2\/categories?post=366"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zackpowersystems.com\/en\/wp-json\/wp\/v2\/tags?post=366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}